A Commentary on Future Beavercreek Road Projects

2026-2030 Timeframe

TIP Number Project When Commentary
31 Beaver Valley Road
from New Germany-Trebein Road to Fairborn City Limits
2026-2030 widen from 2 to 3 lanes. The proximity of wooden hills just to the east and a stream just to the west will make any widening project difficult.
58D Kemp Road
from North Fairfield Road to Hidden Woods Drive
2026-2030 Widen from 2 to 3 lanes. A good start, but it doesn't go far enough between North Fairfield and Hanes Road. It needs to be 5 lanes between those two roads.
407 I-675 2026-2030 Improve access to Research Park. A really long-term privately-funded study which basically means people are considering another interchange between US 35 and Indian Ripple Road. The best locations would have to be Shakertown Road (enough land for a folded diamond north of the current overpass) and OH 835 (extreme proximity of US 35 interchange would dictate a partial folded diamond with northbound exit and southbound merge).